Construction of earth dam at the torrent of Chalavrianos in Municipality of Archanon, Heraklion, Crete. The works include the construction of a spillway at the right abutment, a diversion, drain and irrigation pipeline at the left abutment with its inlet works, which includes the abstraction of the project with the adaptation and escape canals, access roads to the dam and the area of the pumping station, pre-dam diversion pump station at the exit of the diversion, drain and irrigation pipeline and two concrete diversion dam, on the secondary branch of the stream with their associated structures. Moreover, the construction of a water reservoir of 937.500 m3 net volume while the total volume of the dam in normal operating level is 1.011.000 m3. This reservoir supplies irrigation network with a total length 17,40km pipelines to irrigate 2.472 acres.
90 Vasilissis Sofias Avenue,
ZIP: 11528
Αthens